Stanmore

Project Name

Stanmore

Project Type

Class 2 Apartment Renovation

Roles

Management Execution

Waterproofed shower recess with constructed hob and nib wall, Class 2 apartment renovation in Stanmore

The Task

Stanmore Apartment Renovation
A full apartment renovation in Stanmore, and a good example of why Class 2 work is a different game from a standard house reno. The structural challenge is the slab. There’s a concrete slab between every level, and on a top-floor apartment there’s no access from underneath. You can’t chase waste pipes into the slab, so every plumbing run has to be designed above it. We built a nib wall along one side of the bathroom to give the shower waste enough fall back to the main stack. We also constructed a hob for the shower area to achieve the heights we needed. It’s the kind of thing that looks simple in the finished bathroom but requires precise set-out at the start. Fire-proofing is the other layer. We’re removing a wall on the top floor, which means a beam has to go in above the ceiling. To install the beam we have to remove plasterboard, and the moment you touch plasterboard in a fire-rated assembly you have to reinstate it to the correct standard. It’s not optional, and it’s the sort of detail that gets missed by builders who don’t do Class 2 regularly.

The Results

Waterproofed shower recess with constructed hob and nib wall, Class 2 apartment renovation in Stanmore
Bathroom recess with nib wall built to give the shower waste fall back to the main stack, Stanmore apartment renovation
Ceiling opened and reinstated to the correct fire rating after the structural beam went in, Stanmore Class 2 renovation

Extraordinary Builds Begin Here…

Thinking about building or renovating? 
Let’s chat about your vision. We’ll guide you through the process and bring your dream home to life — the right way. 

Let’s Talk